• It is a dam based project. Hence there are not much uncertainties in the execution of the project.

• The project can be utilised as a peak load power generation Station.

• Land required for the project will be identified and assessed by MES and the said land will be transferred by the GON on lease basis.

• MES is having a first right of refusal for any projects that is going to be envisaged on the downstream/ upstream of Dikhu River.

• Dikhu Project is most suitable for Peak power Generation. Hence the Project is capable to regulate the power & supply to the consumer at any time   round the clock.

• The place is blessed with early monsoon which enables to supply Power when other part of Country is reeling under Power shortage.

• Most of the Construction material is available at the vicinity of the Project.

• The Project is having the Best approach.

• The Govt. of Nagaland has already started developing infrastructure like Roads, Lands & Transmission Lines more than 50% is completed.

• The required infrastructure will come into place much before the project requirement.

 

DISPLAY OF DIKHU HYDRO ELECTRIC PROJECT


ON INDEPENDENCE DAY


ENERGY POTENTIAL


ANNUAL ENERGY POTENTIAL
12 % FREE ENERGY TO GON(UPTO 10 YEARS)+ 1% LADA
SALEABLE ENERGY
764 MU
106 MU
658 MU